Pool parking & walkway asphalt repair work – Stay clear April 5, 8 and 15!


Please be advised that the Elmfield pool area parking lot and some walkways will have repair work done on various days including April 5, 8 and 15.

  • Work on the walkways will be done on Friday the 5th and Monday the 8th, and Monday the 15th.
  • Work on the Elmfield pool parking area is only on the 8th and 15th.

The three affected walkways are between these streets:

  • Pinefield & Oakfield
  • Firbrook & Cedar Tree
  • Elmfield & Rios

Timing of the work:

  • The work on the walkways on the 5th will only last a few of hours and they can be used immediately afterward.
  • For work on the 8th, the parking lot and walkways will be closed for 24 hours beginning Sunday prior at 6 pm.
  • For work on the 15th, the parking lot and walkways will be closed 48 hours beginning  Sunday prior at 6 pm.

Do NOT to use the Elmfield pool parking area or block access to the walkways on those dates – your car may be towed.

Weather or other unforeseen events could change the dates and times.

We apologize for any inconvenience, but are sure everyone will appreciate the potholes and trip hazards getting fixed!

Pool area video surveillance system installed
Video Surveillance System Policy Issued